Project Experience

U.S. Army Corps of Engineers

OHIO

Ceasar Creek Shelter & Utilities, $115K
Harsha Lake Paving, $132K

KENTUCKY

Rough River Lake Paving, $732K

FT. CAMPBELL, KENTUCKY

Renovate NCO Academy, Camp Hinsch, & Education Facility, $4.3M
Renovate 52nd EOD Facilities, $675K
5TH SFG Hammerhead Barracks Reset & Triage, $4.6M
Renovate Gardner Pool, Replace Singles Pool & Renovate 49th EOD Building, $3.4M

DEFENSE SUPPLY CENTER, COLUMBUS, OHIO

Energy Conservation Improvements, $801K
Lighting & Controls Upgrade, $1.4M

 

GRISSOM AIR FORCE BASE, INDIANA

Repair Airfield Pavement Upheaval, $1.6M

VA MEDICAL CENTER, INDIANAPOLIS, INDIANA

Site Management / Superintendent
Quality Control Management
Site Safety & Health Management
General Labor
Concrete
Rough Carpentry
Specialties

WRIGHT-PATTERSON AFB, DAYTON, OHIO

Design-Build Building 18B Repair Laser Laboratory, $1.0M
Design-Build Repair West Side Lab Offices in Hanger Building 65, $7.3M
Design-Build Reconfigure Door 9 SCIF in Facility 10280, $1.9M
Design-Build Partial Demolition Building 18F, $381K
Design-Build New Steam Plant in Building 13, $3.2M
Design-Build, Install Electric for Facility 20802, $492K
Reconfigure Room 8110, $794K
Design-Build Mill and Overlay Taxiway B between Runways, $1.9M
Design-Build Replace HVAC at Command Post, $1.7M
Design-Build Reconfiguration of Extended Learning Site, $288K
Design-Build Reconfigure Secure Compartment Areas, $398K
Design-Build Repair / Re-Roof Secure Facilities 34021 and 34024, $1.4M

U.S. Department of Veteran Affairs

V.A. MEDICAL CENTER, LEXINGTON, KENTUCKY

Rough River Lake Paving, $732K

VA MEDICAL CENTER, SAGINAW, MICHIGAN

Surgical Trailer Site Prep, $1.15M
Building 6 Renovation, $3.8M

V.A. MEDICAL CENTER, ANN ARBOR, MI

Install VFD Drives on Exhaust Hoods, $4.4M
Renovate Basement, Bldg. 1 West, $1.3M
Renovate Educational Resource Center, $1.7M

VA MEDICAL CENTER, LOUISVILLE, KY

Replace Hospital HVAC Phase 1, $993K
Replace Hospital HVAC Phase 2, $1.1M
Replace Main Breakers, $455K
Replace HVAC AHU’s Phase 2, $1.1M
Replace HVAC AHU’s Phase 3, $1.2M
Hospital HVAC Upgrades, $1.5M
Renovate Patient Care Unit, $1.6M
Renovate Hospital Parking Lot, $100K
Upgrade IMS Computer Room Cooling, $97K

V.A. MEDICAL CENTER, BATTLE CREEK, MICHIGAN

Renovation of Various Buildings for Women’s Privacy, $890K

Local Installation Contracting Commands

FORT KNOX, KENTUCKY

Ultraviolet Disinfection System, $450 K
Patton Museum Sanitary Sewer, $270 K
Sanitary Sewer Rehabilitation, $68 K

ROCK ISLAND ARSENAL, ILLINOIS

Replace Chillers, Boilers, Switchgear, $6.0 M